Electrical maintenance, EICRs and remedial works for businesses and property portfolios across Manchester, Bolton and Salford.
VoltEdge Systems Ltd plans and carries out the inspection, testing and maintenance that keeps commercial premises and rental properties compliant and working, then puts it in writing. One contractor, a clear calendar, remedials you authorise.
Built for the people who carry the compliance risk
Facilities managers
You need a contractor who turns up when planned, isolates what was agreed and nothing else, and leaves a report you can forward without rewriting. Scope, RAMS and reporting are agreed before the first visit.
Five-year EICR cycles across a portfolio, access coordinated through your process, reports delivered inside the regulatory timescales, remedials quoted separately so landlords stay in control of cost.
A report that satisfies your insurer, your lease and the Electricity at Work Regulations, with the C1, C2 and FI items explained in plain English and priced item by item.
The calendar is agreed with you at the start. Dates below are an example sequence, not a promise of intervals for your site.
Month 0Survey and written scope Boards, circuits, access constraints, shutdown windows and what is excluded.
Month 1EICR Inspection and testing with photographs; C1, C2, C3 and FI findings explained.
Month 1–2Remedials, quoted separately You authorise what is done; certification issued on completion.
QuarterlyPlanned visit Agreed checks, written findings, anything found is priced before it is fixed.
Before next due dateReminder We track the next inspection date so you never find out from an auditor.
Planning tools
Explore LED and solar savings, then plan the next step
Move the sliders to explore your options. The figures are illustrations using inputs you can change. A site survey and written scope are needed before a quotation or a savings commitment.
Lighting upgrades
What could an LED refit save?
Move the sliders to compare your existing lighting with a proposed replacement.
Adjust wattages and electricity price
£1,406illustrative annual electricity saving5,625 kWh less electricity per year, using the example inputs.
Example inputs, not a promised result. Uses the complete fitting wattage and the same operating hours before and after. No installation price, maintenance saving or payback is assumed.
Generation and prices are editable examples, not a roof assessment or current tariff offer. Export income assumes all surplus can be exported at the entered rate. Use on site must match actual demand. Excludes installation, finance, battery, maintenance and tax effects; standing charges remain.
Choose the building and its use to see routine checks, periodic inspection/testing and events that can need earlier review. These are different parts of a maintenance programme.
Routine checks between periodic tests
Choose the building/site use to see the routine-check guidance.
Periodic inspection and testing
Your planning guidance will appear here.
These are planning references. The installation’s condition, use and current report determine the actual interval; routine checks do not replace an EICR. Faults or damage may need earlier action.
Also carried out where it fits the contract: emergency lighting function and duration testing (BS 5266), LED lighting upgrades, distribution board and sub-main works, small commercial installations. Domestic work is taken on for existing landlord clients.
Manchester, Salford, Bolton, Bury, Trafford and Stockport are our core area for maintenance contracts and reactive attendance. We also take planned work across the rest of Greater Manchester. We travel to you; there is no public office. Coverage details.
What stands behind the work
Delivery is planned around the agreed scope, site rules, safe isolation and practical reporting.
Personnel and delivery partners are selected to match the agreed scope, site requirements and certification route.
Management oversight includes site-supervision, health-and-safety management, first-aid-at-work and access-safety training; site-specific RAMS are prepared for every job.
Test instrument and reporting: Megger MFT-X1 multifunction tester and CertSuite digital certification. Calibration evidence can be supplied on request.
Where a project requires a particular certification or supply-chain route, this is agreed before work is accepted. We do not claim memberships or accreditations that have not been confirmed for that work.
Was with us in less than 30 minutes, came in, inspected the sockets and found the issue that was causing all our issues and resolved it within a couple hours.